Carbon in – Oxygen out

With the addition of the new land, Project Rameka is now absorbing 3.8 tonnes of carbon dioxide every day. The total sequestered since the project began in 2008 is approaching 7000 tonnes.

To put that into a personal perspective, the average New Zealander has a carbon footprint of 18 tonnes emitted per annum. Of course, you are not average New Zealanders!

Climate Snapshot

While the scientific reports on climate change remain very serious, since the Paris Climate Talks in December last year there has been a political shift around the globe.

Greenhouse gas levels have risen to record levels and so have global temperatures. 2015 temperatures shot past the record levels of 2014, and now, with the help of El Niño, 2016 is set to be hotter again. Droughts, heatwaves and storms are impacting on food and water security as well as having a massive range of other environmental effects. Just as some countries are particularly unlucky (right now, Zambia, New Mexico, and Australia to name a few), others are very lucky. Perhaps at the top of the latter list is New Zealand, which will be one of the last countries this century to experience an average temperature increase over the notable 2-degree limit.

Possibly that is one reason why New Zealand continues to lag behind most other countries when it comes to introducing effective policies to reduce greenhouse gas emissions. But we live in a globalised world, and change, both of the climate and our government’s policies, can only lag so far. Meanwhile, at Project Rameka we will continue to Make Good Shit Happen!

Trees

Last August, we had another great tree planting week, with 600 native species planted in their new homes. These include northern rata from DOC as well as lemonwood, kohuhu, beech, kaka beak, rimu and miro. It’s great to report that these trees are flourishing at Project Rameka!

DSC09450 (Medium)

Come along and join us for the 2016 tree planting. You would be most welcome.

We will be meeting at 10am on the 20 and 21 August at the top entrance to Project Rameka, which is on Rameka Creek Road, approximately 10 km from Takaka township.

Leave a Reply

Your email address will not be published. Required fields are marked *