The euphoria of a good planting session finally gets to … some, but not all … the planters at August’s planting session. From left to right: Andrew McLellan, Geoff Plimmer, Ricky Ward, Bronnie Wall, Paul Kilgour, Kate Potter, Ann-Louise Metcalfe, Karyn Burgess, Marie Langley and Martin Langley.
200 flaxes, 200 pittos, 40 rata, 25 griselinia, 25 others were planted in August at a well-attended working bee where locals and people travelling from outside the bay were joined by Robyn, Tom and Martin from QE II Trust.
Andrew McLellan installs the first QEII covenant sign at the top of the project, while QEII rep Tom Stein looks on.
Together we put up our new QEII covenant signs and walked the recently cleared historic track.
Simon Johnson and Paul Kilgour study the breathtaking view from the Historic Rameka Pack Track.
The views from the track are just fabulous, and it was agreed that the locals who cleared the top half are legends!!! Looking forward to the next working bee at the project on 18/19 November where the aim is make progress on preparing the track to reach Grade 3 standard.
When we raised funds in order to purchase the additional land at Project Rameka, we said to our generous supporters that we would protect that land.
18 months later, the Rameka Forest Restoration Charitable Trust has honoured that commitment by putting 91 ha of Project Rameka under a QEII National Trust Open Space Covenant.
Liz, Bronnie and Jonathan discuss QEII covenant options with rep Tom Stein at the base of the Rameka carbon forest.
A QEII Open Space Covenant protects the land in perpetuity and ensures its current, and future, owners manage the land in a way that protects its natural values.
Negotiating the covenant with the QEII National Trust involved recognising the uniqueness of Project Rameka being a carbon forest that provides riding, running and walking opportunities for the public.
So we and any future owners of the land are required to manage the land by:
protecting and enhancing the native flora and fauna
enhancing the land as a source of carbon dioxide sequestration
allowing non-motorised recreational activity.
Does this mean anything changes in how we currently manage the land? Not hugely, since so much of what we do is already aligned with the covenant’s purpose. But some things might take a little longer to achieve. For example, if we want to build any new tracks or plant exotic trees, we have to first work with the good folks at the QEII National Trust to decide how that would fit with the covenant aims.
But that is a small price to protect the land for good.
And so it has happened. After more than a year of sorting through building consents and engineering requirements, no more wet toes, ankles … thighs …
It doesn’t happen often, but when the Rameka Creek gets it into its head to flood, it can REALLY go to town.
The bridge over the Rameka Creek to Great Expectations has been built!
The actual building only took nine days. But those were nine totally full-on days.
Many more people were involved than are shown in this selection of photos. And to everyone who helped out – many, many thanks and big thumbs up to all of you.
So, here’s a taste of the action that took place over the week:
First up was measuring out exactly where the bridge needed to go …
Ricky Ward checks that everything lines up true for the bridge across Rameka Creek.
Then it was a case of digging ….
Caver Phil Castle is back in his element – digging into the earth as he helps prepare the foundations trench on the bridge site.
And pumping …
Corina Ward helps pump water from the trench.
And digging – did we mention digging?
Brian Sowman and Andrew Smith knuckle in for just a bit more digging.
Measuring, sorting and sawing timber …
Andy Cole gets into the swing of things at the old mill site next to the creek.
But there was still a bit of time to stand back and assess exactly what it was we were doing.
Martin Langley keeps calm and smiles his way through all the hustle and bustle of bridge prep.
And then it was time for the concrete to be poured for the foundations.
Richard Green arrived with the concrete for the foundations on a brilliant morning – perfect for setting.
Then first the piles and later the beams were lifted into place …
Friday was a wet day, but the 12-metre-long beams got lifted into place anyway.
And after that, it was a case of all hands on deck as volunteers came flocking to help hammer, saw, measure, grease, measure, saw, and measure again, bolt, hammer, dig … all the usual things one does to put a bridge in place.
Evan McCarney said this was the hardest holiday he’d ever had. Most of us agreed.Damian Stones and his son Zac prepared an awesome track to the bridge.David Bennett and Robin Dawson measured twice and cut only once to get all the decking timber exactly to size.The weekend round-up involved finishing the retaining wall at the base of Great Expectations, building a ramp to the other side of the bridge and putting in place the decking and then handrails.Stuart Palmer and Karyn Burgess worked hard to sort out a handrail for the ramp onto the bridge – and it wasn’t easy!Andrew McLellan treated the sawed timber ends while Brett Whiteley and Helen Spring worked on the bridge decking.
And finally the bridge was complete … Ta-daaa!
Fil and Albie Burgers put the final touches of stain to the bridge across the River Rameka.
Just wrapped up a brilliant week at Project Rameka. Great people, and lots done.
After heavy rain we cut back all vegetation hanging over Great Expectations and The Odyssey, as well as digging out a lot of the ruts. The other change that people will notice is that we painted 10 new signs and installed them.
We then refurbished 12 stoat traps that DOC kindly donated, and built boxes for 10 new traps to go along the Rameka valley. The final job was to monitor and release the trees planted last August. The weeds and trees are growing like crazy this spring!
And finally, thanks to the magic of photosynthesis, the trees at Rameka sequestered 26 tonnes of carbon dioxide during the week we were there.
Charlotte test riding Great Expectations. From this we wrote a Track Prescription outlining 20 difficult spots to work on.Ignacio installed one of the new hand painted signs at the top of Project Rameka Inc. We painted and installed signs at every track entrance and fork at Rameka.
Ignacio dug out 8 wheelbarrow loads of soil from under the ‘limbo trunk’ to provide enough room for tall riders.Andy, Simon, Charlotte, Martin, Bronnie, Ignacio, Jonathan and Marie, having a lunch break on Great Expectations. Awesome progress made to this point in only 2 hours!Perrine and Jonathan attempt to cross the Rameka Creek, but had to back out. The strong flow was just about to take them down. This is where the new bridge will be built.Charlotte, Bronnie, Perrine, Ignacio and Jim refurbishing DOC200 stoat traps to place on the historic Rameka Track.Albie and Ignacio modifying old trap boxes to fit new trap mechanisms. Ten of these were then installed along the Rameka Creek Valley by Paul Kilgour who has since caught stoats and rats.Dinner time at Rameka, Catalonia style.