31 March and 1 April 2013
The Odyssey track building competition over Easter saw 55 people carve over 1000 metres of track. It ended up spanning two days, because we tried unsuccessfully to postpone on Sunday when the weather started out looking diabolical, but three Nelson teams were already on their way, despite torrential rain. Luckily it fined up, and they were joined by a dozen locals and the Kennett clan team from Wellington.
On Sunday, competitors built the track all the way through the pines to the 800 metre mark. First equal, having built 160 metres each, were the Quiet Revolution team and the Kennett clan team. The Trail Saints from Nelson were only 10 metres behind in third place.
The weather was perfect on Monday the 1 April, so 30 Golden Bay locals entered, but the building was much tougher as we carved across a steep scrubby face for almost 300
metres.
The end result is that well over half the track has been built. It is currently grade 4 in the pines and grade 5 below that. There is still a fair chunk of work to go, so it probably won’t be
rideable all the way through until summer.
Many thanks to the event sponsors for prizes and materials: Ground Effect, Giro, Cycletech, Quiet Revolution Cycle Shop and The Kennett Brothers.